Three models of roof top solar projects are planned as part of Soura for achieving 500MW solar capacity addition:
MODEL-1: Kerala State Electricity Board Limited & ANERT will utilize the rooftop and land of willing consumers for installing solar plant. The energy generated will be fed into the grid for a period of 25 years and a fixed percentage of generation will be given as the incentive/lease rent to the premises owner for his own use. His monthly/ bi-monthly electricity bill will be reduced to that extent.
#kseb #soura #solar
#Soura disadvantages and cancellation
MODEL – 2: In this model also the consumer does not have to incur any cost of solar plant installation. Instead KSEBL/ANERT will install rooftop or ground mounted plant in consumer premises and the energy generated will be sold to the consumer for 25 years through PPA, as per his requirement at a fixed tariff. The O & M will be done by KSEBL.
MODEL -3: The consumer will be the investor and KSEBL/ANERT will setup the solar plant for the consumer and excess energy if any after the consumption of consumer/ plant owner/ will be fed into KSEB’s grid at predetermined unit rate. If such surplus energy is available, KSEB will pay for such energy at a pre-determined tariff. KSEB can take up maintenance of the plant during the operation period, based on requirement of consumer.
#The7thGunMan
0 Comments